亚博(Yabo)体育

Logo(小)

News
Home Page>>News

8 elements of plastic track maintenance

Release time:2021-06-23 09:07:28

How to maintain the plastic track


Plastic track is a very common and frequently used sports venue. To ensure the normal use and prolong life of the plastic track, the maintenance of the plastic track is extremely important. 

新闻1

1. After the laying of the plastic track is completed, it can be used only after 7-10 days of maintenance.
2. The plastic track is suitable for all-weather use with certain drainage facilities. The plastic track is used for athlete training, competition, student sports and fitness exercise, and is not suitable for other purposes;
3. Avoid the pollution of harmful substances, keep it clean frequently, avoid severe mechanical impact and friction, no vehicles are allowed to drive on the runway, pile up heavy objects and sharp objects, etc. (except standard running shoes). Athletes must wear special sports shoes, the nail length generally does not exceed 7 mm, and jumping shoes generally do not exceed 11 mm. If the sports shoes have long nails, they are not allowed to be used on the plastic track. ;
4. Avoid long-term load;
5. Avoid fireworks and isolate heat sources, avoid contact with organic solvents, chemicals, cigarette butts, other fires, pollutants, etc.
6. It should be cleaned with water spray frequently. After cleaning, a small amount of residual water on the rubber surface can be removed with a dry cloth. Oil stains can be cleaned with 10% ammonia water or detergent or washing powder.
  7. The edge of the plastic runway should be protected and should not be arbitrarily lifted. If damage to the teeth or blistering is found, the construction unit should be notified to repair it in time.

8. Information professionals who find problems 

新闻2

CopyRight © 2013 dinmatin.com All Rights Reserved. Guangdong Lekang Sports Facilities Co., Ltd.

网站ICP备案号:粤ICP备2021096023号
  • This site supports multi-terminal browsingThis site supports multi-terminal browsing